Pharmacon™ Downflow Booths

Pharmacon™ Downflow Booths
  • 연결 부분를 최소화한 모듈러, 세척이 용이하고 견고한 디자인
  • Single, Two-stage 또는 Three-Stage HEPA/ULPA 필터시스템 제공 가능
  • 제거가능한 칸막이 패널이 있어 부스 내부에서 fine dust filter service가 가능
  • Re-circulatory Airflow 또는 Single Pass Airflow 선택 가능
  • Cooling coil을 장착하여 Re-circulatory airflow system에서 발생한 열 상쇄
  • HEPA/ULPA gel-seal downflow filters는 부스 내부에서 교체가 가능. 보편적인 gasketed seals 대신 Gel-seal 사용
  • Voltage-compensating blower(s) 안전적 기류 보장
  • Magnehelic gauges가 더 편리하고 정확한 기류 모니터링 제공 
  • 현장에서 조립 및 설치 필요 
  • 천장과 벽면 및 바닥 구조를 최소화함으로써 사용가능한 작업 구역을 극대화
  • IQ/OQ protocols 가능
  • 기류 방해를 최소화하는 Energy-efficient tear-drop light 사용 
  • 장비에 대한 공장 테스트와 점검을 수행 : Filter integrity, particle count (air cleanliness), downflow velocity and uniformity, exhaust velocity/volume, containment zone verification, noise level, light intensity, temperature rise and electrical safety.
  • ISPE Good Practice Guide, Assessing the Particulate Containment Performance of Pharmaceutical Equipment에 따른 봉쇄 성능 검증 수행

*제품상담 및 문의 

T.02.830.0482 / F.02.830.0491 / [email protected]

Options

  • Bag-in bag-out filter housings for safe filter change.
  • Total exhaust airflow.
  • Built-in cooling coils to offset booth temperature rise.
  • Facia cavities for computers, screens, printers.
  • Front PVC strips.
  • Services such as N2, water, compressed air.
  • Network connections.
  • Containment screen for high-containment applications.
  • Integral equipment such as drum lifters.
  • Hazardous area applications.
  • Temp and humidity control systems.
  • Entry and exit airlocks.
  • Touchscreen and digital pressure alarms in lieu of switches and pressure gauges.

Project Process Flow

  • Project Lead Received
  • Initial Contact by Esco Technical Sales Engineer On-Site Visit to Determine Customer Needs.
  • First Proposal Submitted Complete With Submittal Drawings and Quote.
  • Follow Up Visit(s) and Refinement(s) to Requirements.
  • Final Proposal Submitted, Agremeent on Commercial Details.
  • Customer Issues Purchase Order.
  • Mechanical and Electrical Engineering at Esco.
  • Customer Approval of Design and Drawings.
  • Fabrication and Assembly.
  • Integration of Externally Sourced Equipment (If Required).
  • Factory Acceptance Test at Esco with Documentation.
  • Packaging and Transport.
  • Field Service Installation and Site Acceptance Test.